Contents
9 NON-COMPLIANCE,
COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS
10 IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURE
12 CONCLUSION AND
RECOMMENDATION
Tables
Table 1 Contact
Information of Key Personnel
Table 2 Environmental
Licenses, Notification and Permits Summary
Table 3 Air
Quality Monitoring Equipment
Table 4 Air
Quality Monitoring Location
Table 5 Summary
of Air Quality Monitoring Results
Table 6 Comparison
of 1-hr TSP data with EIA predictions
Table 7 Construction
Noise Monitoring Equipment
Table 8 Monitoring
Parameters and Frequencies of Noise Monitoring
Table 9 Construction
Noise Monitoring Location
Table 10 Summary of Construction Noise
Monitoring Results
Table 11 Comparison of Noise monitoring data
with EIA predictions
Table 12 Water Quality Monitoring and Sampling
Equipment
Table 13 Monitoring Parameters and Frequency
Table 14 Coordinates of Water Quality
Monitoring Locations
Table 15 Summary of Water Quality Exceedance
Table 16 Noise Monitoring Parameters (For
Active Ardeid Night Roost Survey)
Table 17 Active Ardeid Night Roost Survey
Findings
Table 18 Noise Monitoring Parameters (For
Active Ardeid Night Roost Survey)
Table 19 Noise Monitoring Parameters
Table 20 Abundance of all Avifauna Species
Table 21 Abundance of Species of Conservation
Importance
Table 22 Shannon Diversity Index Value of all
Avifauna Species
Table 23 Shannon Diversity Index Value of
Species with Conservation Importance
Table 24 Wetland habitat utilization of all
avifauna species
Table 25 Wetland habitat utilization of
avifauna species of conservation importance
Table 26 Noise Monitoring Results (For
Ecological Monitoring of Birds)
Table 27 Waste Generated by the Construction
and Disposal Ground
Table 28 Status of submissions required under
the EP
Figures
Figure
1 Location of Proposed Yuen Long
Effluent Polishing Plant
Figure
2 Location of Construction Dust
Monitoring Stations
Figure
3 Noise Monitoring Locations
Figure
4 Water Quality Monitoring
Locations
Figure
5 Ecology Monitoring Locations
Appendix
Appendix
A Construction Programme
Appendix
B Project Organization Chart
Appendix
C Action and Limit Levels
Appendix
D Calibration Certificates/ Reports
of Monitoring Equipment
Appendix
E Environmental Monitoring Schedule
Appendix
F Environmental Monitoring Results
Appendix
H Event and Action Plan
Appendix
J Implementation Status of
Environmental Mitigation Measures
Appendix
K Weather and Meteorological
Conditions
Appendix
M Summary of the ET Leader’s Site
Environmental Audit in the Reporting Month
Appendix
N Outstanding Issues and Deficiencies
Appendix
O Active Night Roost Monitoring Area
and Vantage Points; and Noise Monitoring Stations
Appendix
P Ecological Bird Monitoring Area with
Locations of Point Count Sites and Transect Route